Estimating

Price it the way you already do. See the margin before you send it.

Sections and lines that read the way you price a job, your own prices in a catalog you control, and a summary that shows cost, markup, each tax and the margin you are actually making. Change a quantity and everything reprices.

On every plan

An estimate with takeoff measurements (Growth plan): changing the wall length reprices every line built on it, and the cost, markup and margin at the top move with it. Recorded in Ridgepole with sample data.

Sections and lines, in your words

An estimate is a set of sections you name: Demo, Framing, Plumbing, Finishes, whatever you price by. Each line has a description, quantity, unit, unit cost, cost type (material, labour, equipment, subcontract or other) and a markup.

Mark a line optional and it stays out of the total. On the proposal, the client can tick it as an add-on, and the price they sign includes only what they ticked. A line can also carry a note for the client, separate from your own description.

Your prices, not a national database

The cost catalog holds your items: a code if you use one, a category, unit, cost, default markup and supplier. Add a catalog item to an estimate and its name, unit, cost and cost type come with it, along with its own markup if it has one.

Bring your existing price list in from Excel or a CSV, or paste rows straight from a spreadsheet. You match the columns, see a preview of what will be added and what will be updated, and nothing is written until you say so. When lumber moves, adjust a whole category or cost type by a percentage in one step.

Assemblies for the things you build every week

An assembly is a bundle of catalog items with a quantity of each per unit: a linear foot of 2x6 wall, a square of shingles, a bathroom rough-in. Add it to an estimate with a quantity and it expands into priced lines you can still edit.

Markup and margin, side by side

The summary runs left to right in the order the price is built: cost, markup, contingency, subtotal, each tax, total. Under it sit the gross profit in dollars and the margin as a percentage. The margin turns amber below 15 percent and red below 10, because a thin job is the most expensive mistake an estimate can let through.

Markup and margin are not the same number, and the gap is where profit goes missing. A 20 percent markup on cost is a 16.7 percent margin on the price. Ridgepole shows both, so you price for the margin you meant.

  • 10% margin needs 11.1% markup
  • 15% margin needs 17.6% markup
  • 20% margin needs 25% markup
  • 25% margin needs 33.3% markup

Two taxes, set line by line

Every estimate carries a federal rate (GST or HST) and a provincial rate (PST, RST or QST) as separate figures, each with its own line in the summary. Each line is taxed one of three ways: both taxes, the federal tax only, or neither. That is what lets one estimate charge GST only on labour beside GST plus RST on materials.

Your rates and the starting treatment for each cost type are set once in Settings, pre-filled from your province, and every pre-fill says where it came from. For Manitoba and BC, labour starts at GST only. That is a starting point for you to confirm, not tax advice: how your contracts are taxed is a question for your accountant.

Revisions, templates and a PDF

Revise an estimate and you get the next revision under the same number, EST-0007-R2, with the old one kept. Any signing link sent from the old revision stops working the moment you revise, so a client cannot sign last week’s price.

Save any estimate as a template and start the next one from it. A template brings its sections, lines, markup and measurements, and takes today’s tax settings rather than the ones in force when it was saved. An estimate that was sent or became a job cannot be deleted, because it is the record of the price the client was shown.

The Price Clipper (Enterprise)

A Chrome extension that saves a supplier’s price into your cost catalog while you are on their website. It recognises the item you already have, even when the supplier words it differently, and offers to update the price rather than add a duplicate. It connects with a code made in Settings, which only an owner, admin or project manager can create.

Built for how it works in Canada

GST/HST and PST/RST/QST, never one blended rate

Each tax is its own figure with its own rate, computed and rounded separately, so a Manitoba estimate shows GST 5% and RST 7% as two numbers you can check by hand.

Labour and materials taxed differently

Set a line to GST only, both taxes, or exempt. The starting treatment for each cost type comes from your province and is yours to change.

Canadian suppliers in the Price Clipper

On Enterprise, the clipper reads prices from Home Depot Canada, RONA, Lowe’s Canada, Kent, Windsor Plywood, Princess Auto and Canadian Tire, and lets you name the supplier on any other site. Ridgepole is not affiliated with any of them.

Questions builders ask

Is estimating on every plan?

Yes. Estimates, the cost catalog, assemblies, revisions and templates are on Starter, Growth and Enterprise. Takeoff (measuring on drawings and quantity formulas) is on Growth and Enterprise. The Price Clipper is on Enterprise.

Do I have to use your cost codes?

No. Sections and catalog categories are whatever you call them. Nobody has to learn a 48-division code book to price a basement.

Can I import my price list from Excel?

Yes. Choose an Excel or CSV file, or paste rows copied from a spreadsheet. You match the columns, see what will be added or updated, and confirm. Items already in your catalog are recognised by code, or by name and unit, and updated rather than duplicated.

Does the client see my cost and markup?

No. Proposals show the price, by total, by section or line by line, as you choose. Your cost, markup and margin never appear on anything the client sees.

Are the provincial tax rates right?

They are pre-fills, checked against the CRA and provincial sources on the date shown in Settings, and you confirm or change them. Rates change and so do the rules about what is taxable. Your accountant has the final word, not Ridgepole.

Where does contingency show?

In your summary it is its own figure, a percentage added after markup. On the proposal it is spread across the line and section prices, so the client sees one price per line and the sections add up to the subtotal.

See it on your next job.

Start free. 14 days to decide. Questions go straight to someone who knows Ridgepole inside out.

14 days free. No credit card. Use it on a real job. Cancel any time, there is no contract and no exit interview.